Description
Item No. | HY-OFT61 |
Name | Metal Storage Shelving |
Color | customezied |
Material | steel tube, powder coating, metal, waterproof and rustproof |
Size | T:W60*D60*H48CM C:W32*D35*H53CM |
Packing | Polybag, brown export carton |
MOQ | 200 pcs |
Trade term | EXW, FOB, CIF, ect. |
Payment term | TT, LC |
Loading port | Xiamen, China |
Buyers could use their own shipping agent.
If not,we will help customers arrange everything about shipping.
Quality control
1. IQC, Incoming Quality Control when purchasing raw material.
2. IPQC: Input Process Quality Control in every procedure.
3. FQC: Finish Quality Control when products were completed.
4. OQC: Outgoing Quality Control before shipping.
5. Quality Tracking and Quality Improve Meeting after shipping.
Payment terms
1. 30% deposit in advance, 70% against copy of BL. Or L/C at sight.
2. For massive order, detailed payment terms can be negotiated accordingly.
Lead time
1. High season (Sept. to Mar.): 35-40days
2. Low Season (Apr. to Jul.): 25-35 days
3. Trial order or sample order can be flexible by prioritizing.
4. A detailed production schedule for each order will be drew up and it is a platform for further communication between customer and us.